PROJECT DETAILS | |
Project Type: | |
Product: | Fire Rated 2 Mailboxes |
Installation: | Wall Mounted |
Detail:
|
Curved bank of 2 hour fire rated mailboxes |
Cambridge Road
THE PROJECT
The Building a Safer Future Charter has been created to promote an urgent and positive culture and behaviour change in the safety of the built environment. It is about putting people’s safety first in how we plan for, design, build, maintain, and look after the safety of the buildings we live, work or play in and protect those that use them.
THE PRODUCT
SLB’s 2 hour Fire rated mailboxes were used on this project at Cambridge Road, London for a large Housing association and arranged on a radius, providing an interesting yet highly functional arrangement of 2 hour integrity only fully tested mailboxes. The Fire rated range from SLB is tested at Exova Warrington and exceeds 2 hours in temperatures beyond that of molten lava without distortion, flame or deterioration. This system was polyester powder coated in a burnt orange RAL colour , powder used conforms to London Underground specification.
This arrangement also comprised of manual parcelboxes positioned underneath with a manual locking option.
No-obligation FREE consultation
We welcome the chance to discuss your project and we can share all that is current in terms of standards and product options totally free of charge.
Simply complete and submit the form and we will get back in touch WITHIN 24 HOURS to talk through your requirements.
We also provide Autocad drawings as required – it’s all part of the service!
Or drop us a quick email: [email protected]
No-obligation FREE consultation
We welcome the chance to discuss your project and we can share all that is current in terms of standards and product options totally free of charge.
Simply complete and submit the form and we will get back in touch WITHIN 24 HOURS to talk through your requirements.
We also provide Autocad drawings as required – it’s all part of the service!
Or drop us a quick email: [email protected]